The SPMTs arrived from The Netherlands. All equipment was unloaded.
The SPMTs were assembled and tested for correct operation.
Saturday and Sunday the SPMTs will be placed under the antenna.
The relocation is planned for Monday, weather permitting.


Motor being attached to SPMT

Assembled SPMTs

Hydraulic power pack for climbing jacks

SPMT being unloaded with 90 Ton crane